Loading...
1704 W BALL RD (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2018-02332 Issued: 03/26/2019 - INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 49 Site Address: 1704 W BALL RD (T -MOBILE) Legal Description: C (714) 765 - 5153 Project Description: Antenna Cell Site: Install new rooftop antenna cell site for "T -MOBILE" People Associated with Project: EIM Valuation: $50,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 2,983.28 Owner LYMAN LEGACY LLC 2841 S CRODDY WAY #A SANTA ANA CA 92704-5207 Engineer PAUL C PINA 1983 WEST 190TH ST., SUITE 200 TORRANCE CA 90504 Contractor SOLEX CONTRACTING INC 42146 REMINGTON AVE TEMECULA CA 92590 0000 Permit Applicant FERNANDO NIETO Type Electrical Fixtures Qty Type Plumbing Fixtures Meter/Disc Sw - under 600 V, up to 200 1 amps Receptacle, switches, lights 5 Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�PHEIM �q< City of Anaheim o� �o Building Division F y u > �DUNDED Do not occupy this buildinci.until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final g S Plumbing Final Mechanical Final Cross Connection Control (714) 765-4286 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until.the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) CONMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' a Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas g„t PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.)� Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e - 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned ofil Sewer Water Engineering Backflow, (Testable Only) Water Service