Loading...
2222 E CLIFPARK WAY (2)Permit Types BLD ELE MEC PLM X Permit N mbe7; BLD2022-05501 Issued: 11/,17/2022 www.enaheim.net/building (714)765.4626 ' wuarter Section:115 CITY OF ANAHEIM ,3115 Address:.:2222;E.CLIFPARK WAY, ANAHEIM, CA 92806 Lipal: Di;criptlon: N TR 6531 LOT 68 APN:�25309214 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 Project Description: Mechanical to Replace air conditioner and relocate furnace to attic living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Constnrcilon Types: NIA Carport Area: Occupancy Groups: Balcony I Dock Area: Fire Sprinklered: Cod Root Total Fees paid for Permit: 314.00 People Associated with Project: Permit Applicant Tristan Edwards Owner WEAVER EDWARD H 8 LISA M 2222 E CLIFPARK WAY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Evaporative or Air Cooled Condenser 1 Gas System (outlets) 1 Heating Appliances, including vent 1 Heating/Cooling Coil 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM �.9< City of Anaheim D� �o Building Division i U > AD�NDED fah^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DA .E INSPECTOR All applicable items below must be signed before utilit '- released Final Gas Test Electrical Final Plumbing Final _ a anica /(QC{a Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been siane . Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sffianedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New ConstrucHon Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service