3028 W CHERYLLYN LNPermit Types CITY OF ANAHEIMPLMMECBLDELE
X BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number;BLD2021-03853
Issued:09/01/2021
www.anaheim.net/building
(714)765-4626
Quarter Section;10
Site Address:3028 W CHERYLLYN LN,ANAHEIM,CA 92804
Legal Description;
APN:93028423
Project Description:Mechanical to change out furnace (same location),(7)ducts,and air conditioning unit.
0 Valuation;
Construction Types;
Occupancy Groups;
Fire Sprinklered;
Total Fees paid for Permit;
0.00NumberofStories;Living Area;
Garage Area;
Carport Area;
Balcony /Deck Area;
Cool Roof:
Not Applicable
369.00
People Associated with Project:
8333 COLUMBUS AVE.#7 NORTH HILLS,CA 91343
8333 Columbus Ave #7
Permit Applicant
Owner
NASSER SOBH
NASSER SOBH
Qty Mechanical Fixtures QtyQtyTypePlumbingFixturesTypeElectricalFixtures
Heating Appliances,including vent
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit Is required to commence or continue work.
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/FormsTTrenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed: Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)PARTIAL INSPECTIONS
Electrical (Underground Conduit)Building Inspections
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Firesprinkler (Rough)(Fire Dept.)Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures Plumbing Inspections
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
nni h.i'.Hiii 11'"-S'..it'
Sewer
Water Engineering Backfiow (Testable Only)
Water Service