Loading...
1925-1980 S STATE COLLEGE BLVDPermit Types CITY OF ANAHEIMPLMMECBLDELE X X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2023-00945 Issued:07/05/2023 www.anaheim.net/building {714)765-4626 Quarter Section;108 Site Address:1925-1980 S STATE COLLEGE BLVD,Anaheim,CA 92805 Legal Description:P BK 388 PG 39 PAR 3 PM 388-39 PAR 3 POR OF APN:08329303 Project Description:Tenant Improvement:Construct a demising walls at existing shell unit to create (2)separate shell units (#1925 State College and 1980 Gene Autry ●total combined area 4,871 sq ft).Add interior partitions,place (2)un-connected rooftop air conditioning units per suite and plumbing for gas line at each suite. Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: Number of Stories:0 Valuation:35,000.00 Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: lA 3,021.80 People Associated with Project: Contractor Permit Applicant Owner Engineer -Mechanical Engineer -Civil 2582 ASSOCIATED RD APT 1 FULLERTON.CAGALAN'S CONSTRUCTION &AMP;MAINTENA Victor Galanfuentes JEFFERSON AT STADIUM PARK Raymond Duenas RICHARD A PLUMP 600 E LAS COLINAS BLVD 1800 529 W SHADWELL ST LOS ANGELES,CA 90745 914 E KATELLA AVE ANAHEIM,CA 92805 Type Electrical Fixtures Qty Type QtyPlumbingFixtures Mechanical Fixtures Qty Evaporative or Air Cooled Condenser Gas System (outlets) 4 2 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final 'Ji.m-Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfl<y>r Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 7mPlumbing(Ground/Underfioor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Wnised-Teundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed:^ 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been sijned: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Do nol backfill utiless signed off) Sewer Water Engineering Backflow (Testable Only) Water Service